TraceBIM/Permit set checklist

Free checklist · nothing to sign up for

The permit set checklist

Somebody has told you to submit drawings and nobody has told you which drawings. This is a list you can work through: what to ask your building department before you draw anything, which sheets a residential set carries, the checks a plan checker runs on each one, and what to do the day you submit.

Tick the boxes as you go. Your ticks stay on this device, in this browser. Nothing is sent anywhere and no account is involved.

Read this first. Permit requirements are set locally. The list that governs your project is the residential submittal checklist published by the building department that will review it — not this page. Ask them for it, and confirm that they accept plans prepared by someone in your position for your scope of work. Some scopes require a licensed design professional or engineer regardless of who draws the plans.

TraceBIM is drafting software. It is not a licensed architect or engineer, it does not check drawings against a building code, and it does not approve, stamp, or seal anything.

0 of 0 ticked

Part 1

Before you draw anything

Five answers you need in hand. Four of them come from your building department and one comes from the deed. Getting them first is what stops a set being redrawn.

Part 2

The sheets

A permit set is a numbered stack of pages, each one answering a question some specific reader has. Sheets are grouped by discipline and given a letter prefix: G for general, C for civil and site, A for architectural, S for structural, M for mechanical, E for electrical, P for plumbing, L for landscape.

The tags below point at the matching sheet in the Cedar Lane set, a four-bedroom two-storey house drawn end to end in TraceBIM and published sheet by sheet at /proof.html, along with the 42 findings that run produced. Cedar Lane is a complete new-house set across eight disciplines. A garage conversion or a one-room addition is a much shorter list — tick only the rows your department’s checklist asks for.

General — G

Site and civil — C

Architectural — A

Engineering and landscape — S / M / E / P / L

Part 3

The nine checks a plan checker runs

None of these are about the design. They are the drafting faults that get a set written up and sent back, and every one of them is findable before you submit. Print the set at full size and read it the way a stranger would.

Part 4

The day you submit

What the issuance record is, and is not. TraceBIM keeps a permanent record of that attestation — your account, the date and time, your answers, the sheet list, a fingerprint of the exported file, and your IP address — and prints an issuance number on every sheet. It is a record of what you asserted. It is not approval, certification, a stamp, or a seal, and it does not move any responsibility to TraceBIM.

Want this as a PDF?

The same list as a one-page PDF you can print, mark up with a pen, and take to the counter. Leave an address and we will send it.

This form is not wired up yet, so the button is disabled. Everything on this page is already readable and tickable without it.

One email with the PDF, and occasional notes about what TraceBIM can draw. You can ask to be removed at any time. See the Privacy Policy. Prefer not to leave an address? Use the Print button in the bar above — the page is laid out to print as a usable sheet.

Where TraceBIM fits

It draws the set. You are the one who knows the rules.

What it does

  • You mark up a plan. TraceBIM proposes the drawing changes and you approve them one at a time, with a high, medium or low confidence label on each. Nothing lands in a drawing because the model decided it should.
  • Dimension text is derived from the geometry and cannot be typed over, so a drawn dimension cannot disagree with the drawing.
  • A set checklist sits beside the drawings and tracks nine rows — floor plan, elevations, sections, schedules, title block, dimensions, room labels, column grid, north arrow and scale — as a completeness check on your own work.
  • Sheets export as vector PDF that plots to scale, plus an IFC4 file for handoff and a Revit exchange package. The IFC carries 15 of the 50 element types: an architect’s handoff file, not an engineer’s analysis model.

What it does not do

  • It does not read your building department’s checklist and it does not check drawings against a building code.
  • It does not stop you exporting a set that still has placeholder title-block text or an unresolved callout in it. There is no pre-export check for those today. The nine paper checks above are yours to run.
  • No structural analysis, no load calculations, no MEP coordination, no energy modelling.
  • It cannot approve, stamp, or seal anything, and no software can tell you a department will accept your set.

Want to see what the output actually looks like before you believe any of this? The whole Cedar Lane set is published sheet by sheet at /proof.html, with the IFC file, the Revit package, and all 42 findings the test run produced — including the two that are visible in the exported files.

Draw the set yourself.

Start a project on the free plan, bring in a photo of a sketch or a marked-up plan, and see what comes back before you pay for anything.

TraceBIM is drafting software, not a licensed architect or engineer. It does not check plans against the building code and it cannot approve, stamp, or seal anything. Permit rules are local, and confirming them with your building department is your responsibility.